Boil-off gas: sizing for the day that actually happens
Back to Knowledge Base
Process Engineering 6 minKnowledge Base

Boil-off gas: sizing for the day that actually happens

2026-11-15

Steady-state heat leak is the easy number. Ship loading, pump work, barometric swings and warm rundown are what really size a boil-off gas system, and getting the combination wrong means flaring product.

The situation

Every refrigerated tank boils off product because heat leaks in and because filling, pump work and ship operations add energy. The BOG system (compressors, reliquefaction, fuel-gas or flare outlets) must be sized for the worst credible combination of cases, not just the steady holding case.

Why BOG matters

In any refrigerated or cryogenic storage system, boil-off gas is the vapour produced when heat or work is added to the liquid. If it is not recovered, tank pressure rises until relief valves lift. If it is flared, the operator burns product and emits CO₂. Good BOG design keeps pressure stable, keeps product in the tank and keeps the flare dark.

Where boil-off gas comes from, and where it can goSize the BOG system for the worst credible combination, not the steady stateHeat ingresstank roof, shell, baseShip loadingvapour displaced by liquidPump & recirculationwork added to liquidBarometric droppressure falls, liquid flashesWarm rundownfeed above storage tempBOGheaderReliquefactioncompress, condense, returnFuel gasplant heaters, power genRecompression to exportsend to gas networkFlarelast resort, not a design case
Figure: Boil-off gas. Atticus Energy, generic illustration.

The five usual sources

  1. Heat ingress through the roof, shell, base and connected piping. This runs all the time and is the number most people quote.
  2. Ship loading. Liquid going into the ship displaces vapour. Unless that vapour is returned and handled, it can be the largest single load on the system.
  3. Pump and recirculation work. In-tank pumps and line recirculation (used to keep loading lines cold) add energy to the liquid.
  4. Barometric pressure drop. Tanks run close to atmospheric pressure. A falling barometer lowers the margin and liquid flashes.
  5. Warm rundown. Product arriving warmer than storage temperature flashes as it enters the tank.

Building the design cases

Adding every source at its maximum gives an oversized, expensive plant that spends its life recycling. The better approach is to define credible operating scenarios, for example:

  • Holding: heat ingress and recirculation only.
  • Loading: holding plus ship vapour return, with line cooldown at the start.
  • Rundown plus loading: the worst combination that operations will actually see.
  • Upset: loss of one compressor during loading.

Each case gives a flow. The plant is sized for the governing one, with a sparing philosophy that covers the upset.

Disposal routes, in order of preference

  • Reliquefaction: compress, condense and return to the tank. Keeps product and avoids emissions.
  • Fuel gas: where the site has heaters or power generation that can take the vapour.
  • Recompression to a gas network: where one is nearby and the composition fits.
  • Flare: a safety layer for upsets and emergencies. It should not be a design case for normal operation.

Common pitfalls

  • Using vendor heat-leak figures for a new tank on an older, re-insulated or repaired tank.
  • Forgetting the heat added by long, insulated loading lines.
  • No allowance for ship vapour return temperature, which can be much warmer than tank vapour.
  • Controls that react to tank pressure too slowly, so relief valves become the control system.

Key Takeaways

  • List every BOG source and combine them by credible operating scenario, not by adding everything together.
  • Ship loading is usually the governing case for refrigerated terminals.
  • Flaring should be a protection layer, not a routine disposal route.
  • Check minimum-flow behaviour: a compressor that cannot turn down will recycle and waste power.

How Atticus helps

We build BOG balances from first principles, test them against operating scenarios and check them in HAZOP. For existing terminals we reconcile design figures against measured data before recommending new compression or reliquefaction capacity.

Real-world examples

Illustrative scenario

undersized BOG during ship loading

A terminal sized its BOG compressors for tank holding plus normal rundown only. During the first warm-ship loading, vapour return from the ship plus displacement gas exceeded compressor capacity. Tank pressure rose and the operators either slowed loading for many hours or sent gas to flare. The result was demurrage costs and an emissions report to the regulator.

Documented incident

Freeport LNG terminal (2022 incident)

The 2022 incident at an LNG export terminal involved a section of cryogenic piping that was isolated and over-pressurised as trapped LNG warmed. It shows that blocked-in cryogenic liquid and how it warms are design cases, not just operating errors.

Read the investigation / source

If you get it wrong

  • Sustained flaring or venting, emissions breaches and lost product.
  • Loading-rate restrictions that reduce terminal throughput and incur demurrage.
  • Tank over-pressure, or vacuum on rapid send-out if vacuum breakers or make-up gas are inadequate.
  • Compressor trips and recycle loops that waste power for the life of the plant.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.