Steady-state heat leak is the easy number. Ship loading, pump work, barometric swings and warm rundown are what really size a boil-off gas system, and getting the combination wrong means flaring product.
The situation
Every refrigerated tank boils off product because heat leaks in and because filling, pump work and ship operations add energy. The BOG system (compressors, reliquefaction, fuel-gas or flare outlets) must be sized for the worst credible combination of cases, not just the steady holding case.
In any refrigerated or cryogenic storage system, boil-off gas is the vapour produced when heat or work is added to the liquid. If it is not recovered, tank pressure rises until relief valves lift. If it is flared, the operator burns product and emits CO₂. Good BOG design keeps pressure stable, keeps product in the tank and keeps the flare dark.
Adding every source at its maximum gives an oversized, expensive plant that spends its life recycling. The better approach is to define credible operating scenarios, for example:
Each case gives a flow. The plant is sized for the governing one, with a sparing philosophy that covers the upset.
We build BOG balances from first principles, test them against operating scenarios and check them in HAZOP. For existing terminals we reconcile design figures against measured data before recommending new compression or reliquefaction capacity.
A terminal sized its BOG compressors for tank holding plus normal rundown only. During the first warm-ship loading, vapour return from the ship plus displacement gas exceeded compressor capacity. Tank pressure rose and the operators either slowed loading for many hours or sent gas to flare. The result was demurrage costs and an emissions report to the regulator.
The 2022 incident at an LNG export terminal involved a section of cryogenic piping that was isolated and over-pressurised as trapped LNG warmed. It shows that blocked-in cryogenic liquid and how it warms are design cases, not just operating errors.
Read the investigation / sourceLinks go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.
Take this briefing with you
A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.